More than 95% of fields established in 2021 have been inspected by NASC. The pass rate for fields inspected is about 95%. Plans have been made for inspection of the remaining fields. Inspection had been delayed due to insecurity challenges.
More than 95% of fields established in 2021 have been inspected by NASC. The pass rate for fields inspected is about 95%. Plans have been made for inspection of the remaining fields. Inspection had been delayed due to insecurity challenges.